Nautilus Pipeline Company, L.L.C. 

Information Disclosure 

18 C.F.R. §358.7(a)(1) requires if a Transmission Provider discloses non-public transmission function information in a manner contrary to the requirements of §358.6 of the Commission’s Regulations that the Transmission Provider must immediately post the information that was disclosed.

18 C.F.R. §358.7(a)(2) requires if a Transmission Provider discloses, in a manner contrary to §358.6, non-public transmission customer information, critical energy infrastructure information (CEII), or any other information that the Commission has determined is to be subject to limited dissemination, the Transmission Provider must immediately post notice that the information was disclosed.


No disclosures to report at this time.